Denver Rescue Mission Admin Building

Blog Single

Envision designed professional engineering services for a four story administration. The main entry first floor includes the intake center with the associated office and work spaces, core first floor toilet rooms, a waiting area, central main room, mechanical/storage space and the main education classroom area. The second floor includes the data entry offices, operations executive, a large server room, several offices, a break room and break lounge areas, and the second floor toilet room core area with changing areas and showers. The third floor includes core bathrooms, open work area and approximately 20 offices designed for various uses around the perimeter, interior work/circulation space, a conference room and storage makes up the remainder of this floor. The fourth floor included executive offices, a conference room, a large board room, procurement offices, mail room, for the floor core toilets, data processing work area and several other perimeter offices. There is also a partial basement floor area designated for storage.

If you would like additional information about this project or you are looking  for professional services for a similar project, please contact Envision  Mechanical Engineers at  303-688-0223 or email us at info@invisionengrs.com

Candelas K-8 » »